Katie and Dave
The View
Katie, David and Tom Koerner
Brain storming
![Brain storming](http://4.bp.blogspot.com/_PO2IlnMp_s4/R68g_kIIJJI/AAAAAAAAAMw/FGUsyKgStUs/S220/HALSEY.jpeg)
1 Kelly View
The Lot
The View West
Our Two new Crab Apple Trees
Watching over the progress
First Day
Ireland begins
Day one
WOW !!!!!!
First Day
First Day
Day Two
Another Great Day !
Day two
A BIG pile of Dirt
Week 2 Day work day 5
FORMS
Week 2 Day 9
Concrete Walls !!!!!!!
Back Fill
It rains and Ireland Keeps working
David and Katie
Pre meeting with Gene
Forms
week 2 Day 7
Foundation Sealer
Ireland works through the RAIN !!!!!!!
Basement Pump installed
7/30/08
Gene (Project Mgr) and Neighbor
7/28/08
Garage floor
Fill
Backfill
foundation 8/22/08
Back fill 98%
Back fill 98%
Will it ever stop raining ?
Drain well is in
8/1/08
Sauna Tubes are in
7/30/08
Gene (PM) Talks with Site Mgr
"Excavator Mike"
Back fill
7/27/08
Electric Panel (temp)
8/5/08
Ready for slab
Nice Job Ireland !!!!
Window well drain
7/28/08 Back Fill Front of House
New Basement Pump
Pump for under slab
8/5/08
Move more dirt
Basement Floor (slab)
8/5/08
Garage Floor
8/5/08
Lunch
Trees moving up
Holding tank to pump station
About Me
Holding tank
Pump station
First load of Lumber
8-21-08
Day 2 of Framing
Chris is on his way
North Wall goes up
9/14 First Floor Framed
9-22-08
9-22-08
Master south
9-26-08
2nd floor north
9/26/08
2nd floor south
9/26/08
Kitchen
9-26-2008
Front 9-26-08
Fall
one step at a time ...
South end 10/3/08
2nd Floor
Front View
Front Door
a lake view
West
10/12/08
West
South view FALL
Inside Garage 2nd fl
Katie and Chris (Master Carpenter)
10-7-08
Gas line
10-15-08
New Gas line
10-17-08
Front
10-17-08
Front (looking from eastside)
10-17-08
Katie and Dave
Fall day in the sun room
Front
10/25/08
Late Fall 2008
Front
11-2-08